{"name":"SADEED","description":"SADEED | Integrated Interior, Fit-Out, Renovation &amp; FM Solutions Across UAE","url":"https:\/\/sadeedpro.com","home":"https:\/\/sadeedpro.com\/ar","gmt_offset":"0","timezone_string":"","page_for_posts":0,"page_on_front":14,"show_on_front":"page","namespaces":["oembed\/1.0","aioseo\/v1","aioseoBrokenLinkChecker\/v1","litespeed\/v1","litespeed\/v3","novamira\/v1","universally\/v1","elementor-mcp-composer\/v1.0.19","elementor-one\/v1","monsterinsights\/v1","hostinger-reach\/v1","ea11y\/v1","wp-mail-smtp\/setup-wizard\/v1","wp\/v2\/xpro-themer","astra\/v1","google-site-kit\/v1","aios\/v1\/onboarding","elementor\/v1\/documents","elementor\/v1","elementor-ai\/v1","elementor\/v1\/feedback","omapp\/v1","wpforms\/v1","xpro\/v1\/dynamic-content","nps-survey\/v1","mcp","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/sadeedpro.com\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/oembed\/1.0\/proxy"}]}},"\/aioseo\/v1":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"aioseo\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1"}]}},"\/aioseo\/v1\/options":{"namespace":"aioseo\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/options"}]}},"\/aioseo\/v1\/ping":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ping"}]}},"\/aioseo\/v1\/post":{"namespace":"aioseo\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/post"}]}},"\/aioseo\/v1\/post\/(?P<postId>[\\d]+)\/first-attached-image":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/aioseo\/v1\/user\/(?P<userId>[\\d]+)\/image":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/aioseo\/v1\/tags":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/tags"}]}},"\/aioseo\/v1\/search-statistics\/url\/auth":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/search-statistics\/url\/auth"}]}},"\/aioseo\/v1\/search-statistics\/url\/reauth":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/search-statistics\/url\/reauth"}]}},"\/aioseo\/v1\/writing-assistant\/keyword\/(?P<postId>[\\d]+)":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/aioseo\/v1\/writing-assistant\/user-info":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/user-info"}]}},"\/aioseo\/v1\/writing-assistant\/user-options":{"namespace":"aioseo\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/user-options"}]}},"\/aioseo\/v1\/writing-assistant\/report-history":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/report-history"}]}},"\/aioseo\/v1\/seo-analysis\/competitors":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-analysis\/competitors"}]}},"\/aioseo\/v1\/spell-checker\/safe-words":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/spell-checker\/safe-words"}]}},"\/aioseo\/v1\/ai\/image-generator":{"namespace":"aioseo\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/image-generator"}]}},"\/aioseo\/v1\/ai\/insights\/reports":{"namespace":"aioseo\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/insights\/reports"}]}},"\/aioseo\/v1\/ai\/insights\/reports\/(?P<uuid>[a-zA-Z0-9-]+)":{"namespace":"aioseo\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/aioseo\/v1\/seo-checklist":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist"}]}},"\/aioseo\/v1\/seo-checklist\/completed":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/completed"}]}},"\/aioseo\/v1\/ai-agents\/mcp-adapter\/release":{"namespace":"aioseo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai-agents\/mcp-adapter\/release"}]}},"\/aioseo\/v1\/seo-alerts\/test-email":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-alerts\/test-email"}]}},"\/aioseo\/v1\/seo-alerts\/test-slack":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-alerts\/test-slack"}]}},"\/aioseo\/v1\/ai\/auth":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/auth"}]}},"\/aioseo\/v1\/ai\/credits":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/credits"}]}},"\/aioseo\/v1\/ai\/meta\/title":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/meta\/title"}]}},"\/aioseo\/v1\/ai\/meta\/description":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/meta\/description"}]}},"\/aioseo\/v1\/ai\/faqs":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/faqs"}]}},"\/aioseo\/v1\/ai\/schema":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/schema"}]}},"\/aioseo\/v1\/ai\/key-points":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/key-points"}]}},"\/aioseo\/v1\/ai\/social-posts":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/social-posts"}]}},"\/aioseo\/v1\/ai\/assistant":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/assistant"}]}},"\/aioseo\/v1\/ai\/image\/alt":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/image\/alt"}]}},"\/aioseo\/v1\/ai\/truseo\/suggest":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/truseo\/suggest"}]}},"\/aioseo\/v1\/ai\/truseo\/optimize-post":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/truseo\/optimize-post"}]}},"\/aioseo\/v1\/ai\/truseo\/spelling":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/truseo\/spelling"}]}},"\/aioseo\/v1\/ai\/deactivate":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/deactivate"}]}},"\/aioseo\/v1\/htaccess":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/htaccess"}]}},"\/aioseo\/v1\/post\/(?P<postId>[\\d]+)\/disable-primary-term-education":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/post\/(?P<postId>[\\d]+)\/disable-link-format-education":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/post\/(?P<postId>[\\d]+)\/update-internal-link-count":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/post\/(?P<postId>[\\d]+)\/tru-seo-highlighting":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/post\/(?P<postId>[\\d]+)\/process-content":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/posts-list\/load-details-column":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/posts-list\/load-details-column"}]}},"\/aioseo\/v1\/posts-list\/update-details-column":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/posts-list\/update-details-column"}]}},"\/aioseo\/v1\/terms-list\/load-details-column":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/terms-list\/load-details-column"}]}},"\/aioseo\/v1\/terms-list\/update-details-column":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/terms-list\/update-details-column"}]}},"\/aioseo\/v1\/keyphrases":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/keyphrases"}]}},"\/aioseo\/v1\/analyze":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/analyze"}]}},"\/aioseo\/v1\/analyze-headline":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/analyze-headline"}]}},"\/aioseo\/v1\/analyze-headline\/delete":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/analyze-headline\/delete"}]}},"\/aioseo\/v1\/analyze\/delete-site":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/analyze\/delete-site"}]}},"\/aioseo\/v1\/clear-log":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/clear-log"}]}},"\/aioseo\/v1\/connect":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/connect"}]}},"\/aioseo\/v1\/connect-pro":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/connect-pro"}]}},"\/aioseo\/v1\/connect-url":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/connect-url"}]}},"\/aioseo\/v1\/backup":{"namespace":"aioseo\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/backup"}]}},"\/aioseo\/v1\/backup\/restore":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/backup\/restore"}]}},"\/aioseo\/v1\/email-debug-info":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/email-debug-info"}]}},"\/aioseo\/v1\/notification\/email-reports-enable":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/email-reports-enable"}]}},"\/aioseo\/v1\/notification\/blog-visibility-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/blog-visibility-reminder"}]}},"\/aioseo\/v1\/notification\/conflicting-plugins-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/conflicting-plugins-reminder"}]}},"\/aioseo\/v1\/notification\/description-format-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/description-format-reminder"}]}},"\/aioseo\/v1\/notification\/install-addons-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-addons-reminder"}]}},"\/aioseo\/v1\/notification\/install-aioseo-image-seo-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-aioseo-image-seo-reminder"}]}},"\/aioseo\/v1\/notification\/install-aioseo-local-business-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-aioseo-local-business-reminder"}]}},"\/aioseo\/v1\/notification\/install-aioseo-news-sitemap-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-aioseo-news-sitemap-reminder"}]}},"\/aioseo\/v1\/notification\/install-aioseo-video-sitemap-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-aioseo-video-sitemap-reminder"}]}},"\/aioseo\/v1\/notification\/install-mi-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-mi-reminder"}]}},"\/aioseo\/v1\/notification\/install-om-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/install-om-reminder"}]}},"\/aioseo\/v1\/notification\/v3-migration-custom-field-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/v3-migration-custom-field-reminder"}]}},"\/aioseo\/v1\/notification\/v3-migration-schema-number-reminder":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notification\/v3-migration-schema-number-reminder"}]}},"\/aioseo\/v1\/notifications\/dismiss":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/notifications\/dismiss"}]}},"\/aioseo\/v1\/objects":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/objects"}]}},"\/aioseo\/v1\/plugins\/deactivate":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/plugins\/deactivate"}]}},"\/aioseo\/v1\/plugins\/install":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/plugins\/install"}]}},"\/aioseo\/v1\/plugins\/upgrade":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/plugins\/upgrade"}]}},"\/aioseo\/v1\/reset-settings":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/reset-settings"}]}},"\/aioseo\/v1\/search-statistics\/sitemap\/delete":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/search-statistics\/sitemap\/delete"}]}},"\/aioseo\/v1\/search-statistics\/sitemap\/ignore":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/search-statistics\/sitemap\/ignore"}]}},"\/aioseo\/v1\/settings\/export":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/export"}]}},"\/aioseo\/v1\/settings\/export-content":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/export-content"}]}},"\/aioseo\/v1\/settings\/hide-setup-wizard":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/hide-setup-wizard"}]}},"\/aioseo\/v1\/settings\/hide-upgrade-bar":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/hide-upgrade-bar"}]}},"\/aioseo\/v1\/settings\/import":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/import"}]}},"\/aioseo\/v1\/settings\/import\/(?P<siteId>[\\d]+)":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/settings\/import-plugins":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/import-plugins"}]}},"\/aioseo\/v1\/settings\/toggle-card":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/toggle-card"}]}},"\/aioseo\/v1\/settings\/toggle-radio":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/toggle-radio"}]}},"\/aioseo\/v1\/settings\/dismiss-alert":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/dismiss-alert"}]}},"\/aioseo\/v1\/settings\/dismiss-review-cta":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/dismiss-review-cta"}]}},"\/aioseo\/v1\/settings\/items-per-page":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/items-per-page"}]}},"\/aioseo\/v1\/settings\/semrush-country":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/semrush-country"}]}},"\/aioseo\/v1\/settings\/do-task":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/settings\/do-task"}]}},"\/aioseo\/v1\/sitemap\/deactivate-conflicting-plugins":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/sitemap\/deactivate-conflicting-plugins"}]}},"\/aioseo\/v1\/sitemap\/delete-static-files":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/sitemap\/delete-static-files"}]}},"\/aioseo\/v1\/sitemap\/validate-html-sitemap-slug":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/sitemap\/validate-html-sitemap-slug"}]}},"\/aioseo\/v1\/tools\/delete-robots-txt":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/tools\/delete-robots-txt"}]}},"\/aioseo\/v1\/tools\/import-robots-txt":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/tools\/import-robots-txt"}]}},"\/aioseo\/v1\/spell-checker\/download-dictionary":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/spell-checker\/download-dictionary"}]}},"\/aioseo\/v1\/spell-checker\/safe-words\/add":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/spell-checker\/safe-words\/add"}]}},"\/aioseo\/v1\/spell-checker\/safe-words\/remove":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/spell-checker\/safe-words\/remove"}]}},"\/aioseo\/v1\/spell-checker\/safe-words\/match-case":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/spell-checker\/safe-words\/match-case"}]}},"\/aioseo\/v1\/wizard":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/wizard"}]}},"\/aioseo\/v1\/integration\/semrush\/authenticate":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/integration\/semrush\/authenticate"}]}},"\/aioseo\/v1\/integration\/semrush\/refresh":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/integration\/semrush\/refresh"}]}},"\/aioseo\/v1\/integration\/semrush\/keyphrases":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/integration\/semrush\/keyphrases"}]}},"\/aioseo\/v1\/integration\/wpcode\/snippets":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/integration\/wpcode\/snippets"}]}},"\/aioseo\/v1\/crawl-cleanup":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/crawl-cleanup"}]}},"\/aioseo\/v1\/crawl-cleanup\/block":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/crawl-cleanup\/block"}]}},"\/aioseo\/v1\/crawl-cleanup\/delete-blocked":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/crawl-cleanup\/delete-blocked"}]}},"\/aioseo\/v1\/crawl-cleanup\/delete-unblocked":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/crawl-cleanup\/delete-unblocked"}]}},"\/aioseo\/v1\/email-summary\/send":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/email-summary\/send"}]}},"\/aioseo\/v1\/writing-assistant\/process":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/process"}]}},"\/aioseo\/v1\/writing-assistant\/content-analysis":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/content-analysis"}]}},"\/aioseo\/v1\/writing-assistant\/disconnect":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/disconnect"}]}},"\/aioseo\/v1\/writing-assistant\/set-report-progress":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/writing-assistant\/set-report-progress"}]}},"\/aioseo\/v1\/ai\/insights\/reports\/(?P<uuid>[a-zA-Z0-9-]+)\/process":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/ai\/insights\/reports\/(?P<uuid>[a-zA-Z0-9-]+)\/regenerate":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/ai\/insights\/brand-tracker\/subscribe":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai\/insights\/brand-tracker\/subscribe"}]}},"\/aioseo\/v1\/truseo\/posts\/(?P<postId>[\\d]+)":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/truseo\/terms\/(?P<termId>[\\d]+)":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/aioseo\/v1\/seo-checklist\/complete":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/complete"}]}},"\/aioseo\/v1\/seo-checklist\/uncomplete":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/uncomplete"}]}},"\/aioseo\/v1\/seo-checklist\/bulk-complete":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/bulk-complete"}]}},"\/aioseo\/v1\/seo-checklist\/bulk-uncomplete":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/bulk-uncomplete"}]}},"\/aioseo\/v1\/seo-checklist\/action":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/action"}]}},"\/aioseo\/v1\/seo-checklist\/fetch":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/seo-checklist\/fetch"}]}},"\/aioseo\/v1\/ai-agents\/install-mcp-adapter":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai-agents\/install-mcp-adapter"}]}},"\/aioseo\/v1\/ai-agents\/generate-app-password":{"namespace":"aioseo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/ai-agents\/generate-app-password"}]}},"\/aioseo\/v1\/search-statistics\/auth":{"namespace":"aioseo\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseo\/v1\/search-statistics\/auth"}]}},"\/aioseoBrokenLinkChecker\/v1":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"aioseoBrokenLinkChecker\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1"}]}},"\/aioseoBrokenLinkChecker\/v1\/options":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/options"}]}},"\/aioseoBrokenLinkChecker\/v1\/ping":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/ping"}]}},"\/aioseoBrokenLinkChecker\/v1\/broken-links\/scan":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/broken-links\/scan"}]}},"\/aioseoBrokenLinkChecker\/v1\/dashboard":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/dashboard"}]}},"\/aioseoBrokenLinkChecker\/v1\/edit-row":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/edit-row"}]}},"\/aioseoBrokenLinkChecker\/v1\/email-reports\/test":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/email-reports\/test"}]}},"\/aioseoBrokenLinkChecker\/v1\/edit-row\/remove-item":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/edit-row\/remove-item"}]}},"\/aioseoBrokenLinkChecker\/v1\/license\/activate":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/license\/activate"}]}},"\/aioseoBrokenLinkChecker\/v1\/license\/deactivate":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/license\/deactivate"}]}},"\/aioseoBrokenLinkChecker\/v1\/link-status-table":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/link-status-table"}]}},"\/aioseoBrokenLinkChecker\/v1\/link-status-table\/bulk":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/link-status-table\/bulk"}]}},"\/aioseoBrokenLinkChecker\/v1\/link-status-table\/dismiss":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/link-status-table\/dismiss"}]}},"\/aioseoBrokenLinkChecker\/v1\/link-status-table\/recheck":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/link-status-table\/recheck"}]}},"\/aioseoBrokenLinkChecker\/v1\/link-status-table\/undismiss":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/link-status-table\/undismiss"}]}},"\/aioseoBrokenLinkChecker\/v1\/link-status-table\/unlink":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/link-status-table\/unlink"}]}},"\/aioseoBrokenLinkChecker\/v1\/links-table":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/links-table"}]}},"\/aioseoBrokenLinkChecker\/v1\/nps-survey\/dismiss":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/nps-survey\/dismiss"}]}},"\/aioseoBrokenLinkChecker\/v1\/nps-survey\/submit":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/nps-survey\/submit"}]}},"\/aioseoBrokenLinkChecker\/v1\/nps-survey\/review-click":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/nps-survey\/review-click"}]}},"\/aioseoBrokenLinkChecker\/v1\/links-table\/bulk":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/links-table\/bulk"}]}},"\/aioseoBrokenLinkChecker\/v1\/links-table\/unlink":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/links-table\/unlink"}]}},"\/aioseoBrokenLinkChecker\/v1\/network\/sites":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/network\/sites"}]}},"\/aioseoBrokenLinkChecker\/v1\/network\/sites\/update":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/network\/sites\/update"}]}},"\/aioseoBrokenLinkChecker\/v1\/notifications\/dismiss":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/notifications\/dismiss"}]}},"\/aioseoBrokenLinkChecker\/v1\/objects":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/objects"}]}},"\/aioseoBrokenLinkChecker\/v1\/plugins\/deactivate":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/plugins\/deactivate"}]}},"\/aioseoBrokenLinkChecker\/v1\/plugins\/install":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/plugins\/install"}]}},"\/aioseoBrokenLinkChecker\/v1\/redirects\/url":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/redirects\/url"}]}},"\/aioseoBrokenLinkChecker\/v1\/settings\/toggle-card":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/settings\/toggle-card"}]}},"\/aioseoBrokenLinkChecker\/v1\/settings\/toggle-radio":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/settings\/toggle-radio"}]}},"\/aioseoBrokenLinkChecker\/v1\/settings\/items-per-page":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/settings\/items-per-page"}]}},"\/aioseoBrokenLinkChecker\/v1\/settings\/dismiss-cta":{"namespace":"aioseoBrokenLinkChecker\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aioseoBrokenLinkChecker\/v1\/settings\/dismiss-cta"}]}},"\/litespeed\/v1":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v1"}]}},"\/litespeed\/v1\/toggle_crawler_state":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v1\/toggle_crawler_state"}]}},"\/litespeed\/v1\/tool\/check_ip":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v1\/tool\/check_ip"}]}},"\/litespeed\/v1\/guest\/sync":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v1\/guest\/sync"}]}},"\/litespeed\/v3":{"namespace":"litespeed\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v3","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v3"}]}},"\/litespeed\/v3\/ip_validate":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v3\/ip_validate"}]}},"\/litespeed\/v3\/wp_rest_echo":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v3\/wp_rest_echo"}]}},"\/litespeed\/v3\/ping":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v3\/ping"}]}},"\/litespeed\/v3\/cdn_status":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v3\/cdn_status"}]}},"\/litespeed\/v1\/notify_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v1\/notify_img"}]}},"\/litespeed\/v3\/err_domains":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/litespeed\/v3\/err_domains"}]}},"\/novamira\/v1":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"novamira\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1"}]}},"\/novamira\/v1\/upload":{"namespace":"novamira\/v1","methods":["POST","PUT"],"endpoints":[{"methods":["POST","PUT"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/upload"}]}},"\/novamira\/v1\/admin-access":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/admin-access"}]}},"\/novamira\/v1\/admin-access\/(?P<nonce>[A-Za-z0-9_-]+)":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/novamira\/v1\/troubleshoot\/run-checks":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/troubleshoot\/run-checks"}]}},"\/novamira\/v1\/abilities\/(?P<ability_name>[a-z0-9-]+(?:\/[a-z0-9-]+)+)\/run":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ability_name":{"type":"string","pattern":"^[a-z0-9-]+(?:\/[a-z0-9-]+)+$","required":true},"input":{"description":"Any JSON value passed to the target Ability. Omitted means null.","required":false}}}]},"\/universally\/v1":{"namespace":"universally\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"universally\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1"}]}},"\/universally\/v1\/validate-api-key":{"namespace":"universally\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/validate-api-key"}]}},"\/universally\/v1\/languages":{"namespace":"universally\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/languages"}]}},"\/universally\/v1\/dismiss-general-hero":{"namespace":"universally\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/dismiss-general-hero"}]}},"\/universally\/v1\/refresh-languages":{"namespace":"universally\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/refresh-languages"}]}},"\/universally\/v1\/refresh-site-config":{"namespace":"universally\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/refresh-site-config"}]}},"\/universally\/v1\/ping":{"namespace":"universally\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/ping"}]}},"\/universally\/v1\/activation\/exchange":{"namespace":"universally\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/activation\/exchange"}]}},"\/universally\/v1\/activation\/commit":{"namespace":"universally\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/activation\/commit"}]}},"\/universally\/v1\/activation\/cancel":{"namespace":"universally\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/universally\/v1\/activation\/cancel"}]}},"\/elementor-mcp-composer\/v1.0.19":{"namespace":"elementor-mcp-composer\/v1.0.19","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-mcp-composer\/v1.0.19","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-mcp-composer\/v1.0.19"}]}},"\/elementor-mcp-composer\/v1.0.19\/mcp-settings":{"namespace":"elementor-mcp-composer\/v1.0.19","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"enabled":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-mcp-composer\/v1.0.19\/mcp-settings"}]}},"\/elementor-mcp-composer\/v1.0.19\/mcp-credentials":{"namespace":"elementor-mcp-composer\/v1.0.19","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"client":{"type":"string","enum":["claude-code","claude-desktop","codex","cursor","other"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-mcp-composer\/v1.0.19\/mcp-credentials"}]}},"\/elementor-one\/v1":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-one\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1"}]}},"\/elementor-one\/v1\/connect\/authorize":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/connect\/authorize"}]}},"\/elementor-one\/v1\/connect\/disconnect":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/connect\/disconnect"}]}},"\/elementor-one\/v1\/connect\/switch-domain":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/connect\/switch-domain"}]}},"\/elementor-one\/v1\/connect\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/connect\/deactivate"}]}},"\/elementor-one\/v1\/top-bar\/notifications":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"app_name":{"type":"string","required":true},"app_version":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/top-bar\/notifications"}]}},"\/elementor-one\/v1\/top-bar\/feedback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product":{"type":"string","required":true},"subject":{"type":"string","required":true},"title":{"type":"string","required":true},"description":{"type":"string","required":true},"countryCode":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/top-bar\/feedback"}]}},"\/elementor-one\/v1\/themes":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The theme activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/themes"}]}},"\/elementor-one\/v1\/themes\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true}}}]},"\/elementor-one\/v1\/plugins":{"namespace":"elementor-one\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/plugins"}]}},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/upgrade":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["active"],"required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/run":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez"},"required":true},"force":{"type":"boolean","default":true,"description":"Force migration even if the plugin is already connected.","required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/rollback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez"},"required":true}}}]},"\/elementor-one\/v1\/settings":{"namespace":"elementor-one\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/settings"}]}},"\/elementor-one\/v1\/manage-dashboard-widget\/state":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/manage-dashboard-widget\/state"}]}},"\/elementor-one\/v1\/logs":{"namespace":"elementor-one\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-one\/v1\/logs"}]}},"\/novamira\/v1\/chat\/status":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/status"}]}},"\/novamira\/v1\/chat\/sessions":{"namespace":"novamira\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/sessions"}]}},"\/novamira\/v1\/chat\/sessions\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"novamira\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/novamira\/v1\/chat\/model-step":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/model-step"}]}},"\/novamira\/v1\/chat\/tools":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/tools"}]}},"\/novamira\/v1\/chat\/models":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/models"}]}},"\/novamira\/v1\/chat\/consent":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/consent"}]}},"\/novamira\/v1\/chat\/tools\/execute":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/tools\/execute"}]}},"\/novamira\/v1\/chat\/approvals":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/chat\/approvals"}]}},"\/novamira\/v1\/visual-safe-backend-tools\/discover":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/visual-safe-backend-tools\/discover"}]}},"\/novamira\/v1\/visual-safe-backend-tools\/call":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/visual-safe-backend-tools\/call"}]}},"\/novamira\/v1\/gutenberg\/batches":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/gutenberg\/batches"}]}},"\/novamira\/v1\/gutenberg\/finalizer-runtime\/heartbeat":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/gutenberg\/finalizer-runtime\/heartbeat"}]}},"\/novamira\/v1\/gutenberg\/finalizer-runtime\/status":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/gutenberg\/finalizer-runtime\/status"}]}},"\/novamira\/v1\/gutenberg\/finalizer-runtime\/events":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/gutenberg\/finalizer-runtime\/events"}]}},"\/novamira\/v1\/gutenberg\/batches\/(?P<batch_id>\\d+)\/claim":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/novamira\/v1\/gutenberg\/batches\/claim-next":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/gutenberg\/batches\/claim-next"}]}},"\/novamira\/v1\/gutenberg\/batches\/(?P<batch_id>\\d+)\/items\/claim-next":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/novamira\/v1\/gutenberg\/items\/(?P<item_id>\\d+)\/spec":{"namespace":"novamira\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/novamira\/v1\/gutenberg\/items\/(?P<item_id>\\d+)\/complete":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/novamira\/v1\/gutenberg\/items\/(?P<item_id>\\d+)\/fail":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/novamira\/v1\/gutenberg\/batches\/(?P<batch_id>\\d+)\/cancel":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/monsterinsights\/v1":{"namespace":"monsterinsights\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"monsterinsights\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/monsterinsights\/v1"}]}},"\/monsterinsights\/v1\/feedback":{"namespace":"monsterinsights\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/monsterinsights\/v1\/feedback"}]}},"\/monsterinsights\/v1\/onboarding\/settings":{"namespace":"monsterinsights\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"onboarding_key":{"type":"string","required":true}}},{"methods":["POST"],"args":{"onboarding_key":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/monsterinsights\/v1\/onboarding\/settings"}]}},"\/monsterinsights\/v1\/onboarding\/connect-url":{"namespace":"monsterinsights\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"license_key":{"type":"string","required":true},"onboarding_key":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/monsterinsights\/v1\/onboarding\/connect-url"}]}},"\/monsterinsights\/v1\/onboarding\/set-license-key":{"namespace":"monsterinsights\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"type":"string","required":true},"onboarding_key":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/monsterinsights\/v1\/onboarding\/set-license-key"}]}},"\/monsterinsights\/v1\/onboarding\/delete-onboarding-key":{"namespace":"monsterinsights\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"onboarding_key":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/monsterinsights\/v1\/onboarding\/delete-onboarding-key"}]}},"\/hostinger-reach\/v1":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"hostinger-reach\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1"}]}},"\/hostinger-reach\/v1\/contact":{"namespace":"hostinger-reach\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":true},"group":{"default":"WordPress","type":"string","required":false},"tags":{"default":"WordPress","type":"string","required":false},"email":{"type":"string","required":true},"name":{"default":"","type":"string","required":false},"surname":{"default":"","type":"string","required":false},"phone":{"default":"","type":"string","required":false},"metadata":{"type":"object","properties":{"plugin":{"type":"string"}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/contact"}]}},"\/hostinger-reach\/v1\/token":{"namespace":"hostinger-reach\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"csrf_field":{"type":"string","required":true},"token":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/token"}]}},"\/hostinger-reach\/v1\/connect":{"namespace":"hostinger-reach\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/connect"}]}},"\/hostinger-reach\/v1\/generate-auth-url":{"namespace":"hostinger-reach\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/generate-auth-url"}]}},"\/hostinger-reach\/v1\/connection-success":{"namespace":"hostinger-reach\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/connection-success"}]}},"\/hostinger-reach\/v1\/overview":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/overview"}]}},"\/hostinger-reach\/v1\/tags":{"namespace":"hostinger-reach\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"names":{"type":"array","default":["WordPress"],"items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/tags"}]}},"\/hostinger-reach\/v1\/builder-forms":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/builder-forms"}]}},"\/hostinger-reach\/v1\/builder-form-preview\/(?P<id>[a-zA-Z0-9\\-]+)":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"string","required":true}}}]},"\/hostinger-reach\/v1\/contact-lists":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/contact-lists"}]}},"\/hostinger-reach\/v1\/forms":{"namespace":"hostinger-reach\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"contact_list_id":{"type":"int","required":false},"type":{"type":"string","required":false}}},{"methods":["POST"],"args":{"form_id":{"type":"string","required":true},"type":{"type":"string","required":true},"is_active":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/forms"}]}},"\/hostinger-reach\/v1\/integrations":{"namespace":"hostinger-reach\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"integration":{"type":"string","required":true},"is_active":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/integrations"}]}},"\/hostinger-reach\/v1\/status":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/status"}]}},"\/hostinger-reach\/v1\/import\/(?P<integration>[a-z0-9-]+)":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"integration":{"type":"string","required":true}}}]},"\/hostinger-reach\/v1\/import":{"namespace":"hostinger-reach\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"integrations":{"type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/import"}]}},"\/hostinger-reach\/v1\/hosting\/domain-details":{"namespace":"hostinger-reach\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/hostinger-reach\/v1\/hosting\/domain-details"}]}},"\/ea11y\/v1":{"namespace":"ea11y\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ea11y\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1"}]}},"\/ea11y\/v1\/connect\/authorize":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/connect\/authorize"}]}},"\/ea11y\/v1\/connect\/disconnect":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/connect\/disconnect"}]}},"\/ea11y\/v1\/connect\/switch-domain":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/connect\/switch-domain"}]}},"\/ea11y\/v1\/connect\/deactivate":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/connect\/deactivate"}]}},"\/ea11y\/v1\/settings\/get-settings":{"namespace":"ea11y\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/settings\/get-settings"}]}},"\/ea11y\/v1\/settings\/get-media":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/settings\/get-media"}]}},"\/ea11y\/v1\/analytics\/statistic":{"namespace":"ea11y\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/analytics\/statistic"}]}},"\/ea11y\/v1\/reviews\/review":{"namespace":"ea11y\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/ea11y\/v1\/reviews\/review"}]}},"\/wp-mail-smtp\/setup-wizard\/v1":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-mail-smtp\/setup-wizard\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/health":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/health"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/hydrate":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/hydrate"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/update":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/update"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/settings":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/settings"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/import-settings":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/import-settings"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-connected-data":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-connected-data"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-oauth-url":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-oauth-url"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/remove-oauth-connection":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/remove-oauth-connection"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/sendlayer-disconnect":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/sendlayer-disconnect"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/check-mailer-configuration":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/check-mailer-configuration"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/mailer-preflight":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/mailer-preflight"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/install-plugin":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/install-plugin"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/upgrade-plugin":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/upgrade-plugin"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-partner-plugins-info":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-partner-plugins-info"}]}},"\/wp\/v2\/xpro-themer":{"namespace":"wp\/v2\/xpro-themer","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2\/xpro-themer","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/xpro-themer"}]}},"\/wp\/v2\/xpro-themer\/get-settings":{"namespace":"wp\/v2\/xpro-themer","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/xpro-themer\/get-settings"}]}},"\/wp\/v2\/xpro-themer\/update-settings":{"namespace":"wp\/v2\/xpro-themer","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/xpro-themer\/update-settings"}]}},"\/wp\/v2\/xpro-themer\/create-post":{"namespace":"wp\/v2\/xpro-themer","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/xpro-themer\/create-post"}]}},"\/wp\/v2\/xpro-themer\/get-posts":{"namespace":"wp\/v2\/xpro-themer","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/xpro-themer\/get-posts"}]}},"\/wp\/v2\/xpro-themer\/delete-post\/(?P<id>\\d+)":{"namespace":"wp\/v2\/xpro-themer","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/xpro-themer\/untrash-post\/(?P<id>\\d+)":{"namespace":"wp\/v2\/xpro-themer","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/wp\/v2\/xpro-themer\/get-post\/(?P<id>\\d+)":{"namespace":"wp\/v2\/xpro-themer","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/wp\/v2\/xpro-themer\/update-post\/(?P<id>\\d+)":{"namespace":"wp\/v2\/xpro-themer","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/novamira\/v1\/oauth\/register":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/oauth\/register"}]}},"\/novamira\/v1\/oauth\/token":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/oauth\/token"}]}},"\/novamira\/v1\/oauth\/device":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/oauth\/device"}]}},"\/novamira\/v1\/oauth\/revoke":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/oauth\/revoke"}]}},"\/novamira\/v1\/oauth\/introspect":{"namespace":"novamira\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/novamira\/v1\/oauth\/introspect"}]}},"\/astra\/v1":{"namespace":"astra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"astra\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/astra\/v1"}]}},"\/astra\/v1\/admin\/settings":{"namespace":"astra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/astra\/v1\/admin\/settings"}]}},"\/astra\/v1\/get-learn-chapters":{"namespace":"astra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/astra\/v1\/get-learn-chapters"}]}},"\/astra\/v1\/update-learn-progress":{"namespace":"astra\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"chapterId":{"type":"string","required":true},"stepId":{"type":"string","required":true},"completed":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/astra\/v1\/update-learn-progress"}]}},"\/google-site-kit\/v1":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"google-site-kit\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1"}]}},"\/google-site-kit\/v1\/core\/site\/data\/setup-tag":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/setup-tag"}]}},"\/google-site-kit\/v1\/core\/site\/data\/connection":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/connection"}]}},"\/google-site-kit\/v1\/core\/user\/data\/authentication":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/authentication"}]}},"\/google-site-kit\/v1\/core\/user\/data\/disconnect":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/disconnect"}]}},"\/google-site-kit\/v1\/core\/user\/data\/get-token":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/get-token"}]}},"\/google-site-kit\/v1\/core\/user\/data\/user-input-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"questions":{"purpose":{"type":"array","items":{"type":"string"}},"postFrequency":{"type":"array","items":{"type":"string"}},"goals":{"type":"array","items":{"type":"string"}},"includeConversionEvents":{"type":"array","items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/user-input-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/audience-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"configuredAudiences":{"type":"array","items":{"type":"string"}},"isAudienceSegmentationWidgetHidden":{"type":"boolean"},"didSetAudiences":{"type":"boolean"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/audience-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/conversion-reporting-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"newEventsCalloutDismissedAt":{"type":"integer"},"lostEventsCalloutDismissedAt":{"type":"integer"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/conversion-reporting-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/email-reporting-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"frequency":{"type":"string","enum":["weekly","monthly","quarterly"]},"subscribed":{"type":"boolean"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/email-reporting-settings"}]}},"\/google-site-kit\/v1\/core\/user\/data\/email-reporting-next-report":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/email-reporting-next-report"}]}},"\/google-site-kit\/v1\/core\/user\/data\/initial-setup-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"hasSitePurposeAnswer":{"type":"boolean"},"isAnalyticsSetupComplete":{"type":"boolean"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/initial-setup-settings"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/list":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/list"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/activation":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/activation"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/info":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/info"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/check-access":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/check-access"}]}},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/notifications":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false},"data":{"type":"object","description":"Settings to set.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/data-available":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/modules\/(?P<slug>[a-z0-9\\-]+)\/data\/(?P<datapoint>[a-z\\-]+)":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false},"datapoint":{"type":"string","description":"Module data point to address.","default":null,"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"slug":{"type":"string","description":"Identifier for the module.","default":null,"required":false},"datapoint":{"type":"string","description":"Module data point to address.","default":null,"required":false},"data":{"type":"object","description":"Data to set.","default":null,"required":false}}}]},"\/google-site-kit\/v1\/core\/modules\/data\/recover-modules":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/recover-modules"}]}},"\/google-site-kit\/v1\/core\/modules\/data\/sharing-settings":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/modules\/data\/sharing-settings"}]}},"\/google-site-kit\/v1\/core\/intents\/data\/intent":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"type":"string","description":"","default":null,"required":true},"intent_code":{"type":"string","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/intents\/data\/intent"}]}},"\/google-site-kit\/v1\/core\/intents\/data\/complete-intent":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"slug":{"type":"string","required":true},"intent_code":{"type":"string","required":true}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/intents\/data\/complete-intent"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismissed-items":{"namespace":"google-site-kit\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":{"data":{"type":"object","description":"","default":null,"minProperties":1,"additionalProperties":false,"properties":{"slugs":{"type":"array","required":true,"items":{"type":"string"}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismissed-items"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismiss-item":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismiss-item"}]}},"\/google-site-kit\/v1\/core\/user\/data\/expirable-items":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/expirable-items"}]}},"\/google-site-kit\/v1\/core\/user\/data\/set-expirable-item-timers":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"array","description":"","default":null,"items":{"type":"object","additionalProperties":false,"properties":{"slug":{"type":"string","required":true},"expiration":{"type":"integer","required":true}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/set-expirable-item-timers"}]}},"\/google-site-kit\/v1\/core\/user\/data\/permissions":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/permissions"}]}},"\/google-site-kit\/v1\/core\/user\/data\/nonces":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/nonces"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey-trigger":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"triggerID":{"type":"string","required":true},"ttl":{"type":"integer","minimum":0}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey-trigger"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey-event":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"session":{"type":"object","required":true,"properties":{"session_id":{"type":"string","required":true},"session_token":{"type":"string","required":true}}},"event":{"type":"object","required":true,"properties":{"survey_shown":{"type":"object"},"survey_closed":{"type":"object"},"question_answered":{"type":"object"},"completion_shown":{"type":"object"},"follow_up_link_clicked":{"type":"object"}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey-event"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey-timeouts":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey-timeouts"}]}},"\/google-site-kit\/v1\/core\/user\/data\/survey":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/survey"}]}},"\/google-site-kit\/v1\/core\/site\/data\/reset":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/reset"}]}},"\/google-site-kit\/v1\/core\/site\/data\/reset-persistent":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/reset-persistent"}]}},"\/google-site-kit\/v1\/core\/site\/data\/developer-plugin":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/developer-plugin"}]}},"\/google-site-kit\/v1\/core\/user\/data\/tracking":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"enabled":{"type":"boolean","required":true}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/tracking"}]}},"\/google-site-kit\/v1\/core\/search\/data\/entity-search":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"query":{"type":"string","description":"Text content to search for.","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/search\/data\/entity-search"}]}},"\/google-site-kit\/v1\/core\/site\/data\/admin-bar-settings":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"enabled":{"type":"boolean","required":false}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/admin-bar-settings"}]}},"\/google-site-kit\/v1\/core\/site\/data\/notifications":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/notifications"}]}},"\/google-site-kit\/v1\/core\/site\/data\/mark-notification":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/mark-notification"}]}},"\/google-site-kit\/v1\/core\/site\/data\/site-health-tag-placement-test":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/site-health-tag-placement-test"}]}},"\/google-site-kit\/v1\/core\/site\/data\/health-checks":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/health-checks"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismissed-tours":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismissed-tours"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismiss-tour":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismiss-tour"}]}},"\/google-site-kit\/v1\/core\/user\/data\/key-metrics":{"namespace":"google-site-kit\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"properties":{"isWidgetHidden":{"type":"boolean","required":true},"widgetSlugs":{"type":"array","required":false,"maxItems":8,"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/key-metrics"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismissed-prompts":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismissed-prompts"}]}},"\/google-site-kit\/v1\/core\/user\/data\/dismiss-prompt":{"namespace":"google-site-kit\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"object","description":"","default":null,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/user\/data\/dismiss-prompt"}]}},"\/google-site-kit\/v1\/core\/site\/data\/consent-mode":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"enabled":{"type":"boolean"},"regions":{"type":"array","items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/consent-mode"}]}},"\/google-site-kit\/v1\/core\/site\/data\/consent-api-info":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/consent-api-info"}]}},"\/google-site-kit\/v1\/core\/site\/data\/consent-api-activate":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/consent-api-activate"}]}},"\/google-site-kit\/v1\/core\/site\/data\/ads-measurement-status":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/ads-measurement-status"}]}},"\/google-site-kit\/v1\/core\/site\/data\/conversion-tracking":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"properties":{"enabled":{"type":"boolean","required":true}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/conversion-tracking"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting":{"namespace":"google-site-kit\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"settings":{"type":"object","required":true,"minProperties":1,"additionalProperties":false,"properties":{"enabled":{"type":"boolean","required":true}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-eligible-subscribers":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","description":"","default":1,"minimum":1,"required":false},"per_page":{"type":"integer","description":"","default":20,"minimum":1,"maximum":100,"required":false},"search":{"type":"string","description":"","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-eligible-subscribers"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-subscribed-users":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","description":"","default":1,"minimum":1,"required":false},"per_page":{"type":"integer","description":"","default":20,"minimum":1,"maximum":100,"required":false},"search":{"type":"string","description":"","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-subscribed-users"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-unsubscribe-user":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"userID":{"type":"integer","required":true,"minimum":1}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-unsubscribe-user"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-errors":{"namespace":"google-site-kit\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-errors"}]}},"\/google-site-kit\/v1\/core\/site\/data\/email-reporting-invite-user":{"namespace":"google-site-kit\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"data":{"type":"object","description":"","default":null,"properties":{"userID":{"type":"integer","required":true,"minimum":1}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/google-site-kit\/v1\/core\/site\/data\/email-reporting-invite-user"}]}},"\/aios\/v1\/onboarding":{"namespace":"aios\/v1\/onboarding","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"aios\/v1\/onboarding","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aios\/v1\/onboarding"}]}},"\/aios\/v1\/onboarding\/tfa_key_is_valid":{"namespace":"aios\/v1\/onboarding","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/aios\/v1\/onboarding\/tfa_key_is_valid"}]}},"\/aios\/v1\/onboarding\/do_action\/(?P<action>[a-z\\_\\-]+)":{"namespace":"aios\/v1\/onboarding","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/elementor\/v1\/documents":{"namespace":"elementor\/v1\/documents","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/documents","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/documents"}]}},"\/elementor\/v1\/documents\/(?P<id>\\d+)\/media\/import":{"namespace":"elementor\/v1\/documents","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true}}}]},"\/elementor\/v1":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1"}]}},"\/elementor\/v1\/cache":{"namespace":"elementor\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/cache"}]}},"\/elementor\/v1\/globals":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/globals"}]}},"\/elementor\/v1\/globals\/colors":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/globals\/colors"}]}},"\/elementor\/v1\/globals\/colors\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/globals\/typography":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/globals\/typography"}]}},"\/elementor\/v1\/globals\/typography\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/mcp-proxy":{"namespace":"elementor\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"tool":{"type":"string","required":true},"input":{"type":"object","required":true}}},{"methods":["GET"],"args":{"uri":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/mcp-proxy"}]}},"\/elementor\/v1\/settings\/(?P<key>[\\w_-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/elementor\/v1\/post":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included post types","type":"array","default":null,"required":false},"excluded_types":{"description":"Post type to exclude","type":"array","default":["e-floating-buttons","e-landing-page","elementor_library","attachment","revision","nav_menu_item","custom_css","customize_changeset"],"required":false},"term":{"description":"Posts to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"ID":"id","post_title":"label","post_type":"groupLabel"},"required":false},"items_count":{"description":"Posts per page","type":"integer","default":100,"required":false},"is_public":{"description":"Whether to include only public post types","type":"boolean","default":true,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false},"tax_query":{"description":"WP_Query tax_query array","type":"array","default":null,"required":false},"search_in_content":{"description":"Whether to search within post content and excerpt in addition to title","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/post"}]}},"\/elementor\/v1\/term":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"excluded_types":{"description":"Excluded taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"term":{"description":"Terms to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"term_id":"id","name":"label","taxonomy":"groupLabel"},"required":false},"items_count":{"description":"Terms per request","type":"integer","default":100,"required":false},"hide_empty":{"description":"Whether to include only public terms","type":"boolean","default":false,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/term"}]}},"\/elementor\/v1\/user":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term":{"description":"Users to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":["array","string"],"default":{"ID":"id","display_name":"label","role":"groupLabel"},"required":false},"items_count":{"description":"Number of users to return","type":"integer","default":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/user"}]}},"\/elementor-ai\/v1":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-ai\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-ai\/v1"}]}},"\/elementor-ai\/v1\/permissions":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor-ai\/v1\/permissions"}]}},"\/elementor\/v1\/favorites":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/favorites"}]}},"\/elementor\/v1\/favorites\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to create.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to delete.","type":"string","required":true}}}]},"\/elementor\/v1\/kit-elements-defaults":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/kit-elements-defaults"}]}},"\/elementor\/v1\/kit-elements-defaults\/(?P<type>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","description":"The type of the element.","required":true},"settings":{"description":"All the default values for the requested type","type":"object","required":true}}},{"methods":["DELETE"],"args":{"type":{"type":"string","description":"The type of the element.","required":true}}}]},"\/elementor\/v1\/site-navigation\/recent-posts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"posts_per_page":{"description":"Number of posts to return","type":"integer","required":true},"post_type":{"description":"Post types to retrieve","type":"array","default":["page","post","elementor_library"],"required":false},"post__not_in":{"description":"Post id`s to exclude","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/site-navigation\/recent-posts"}]}},"\/elementor\/v1\/site-navigation\/add-new-post":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"Post type to create","type":"string","default":"post","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/site-navigation\/add-new-post"}]}},"\/elementor\/v1\/design-system-sync\/stylesheet":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/design-system-sync\/stylesheet"}]}},"\/elementor\/v1\/operations\/opt-in-v4":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/operations\/opt-in-v4"}]}},"\/elementor\/v1\/feedback":{"namespace":"elementor\/v1\/feedback","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/feedback","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/feedback"}]}},"\/elementor\/v1\/feedback\/submit":{"namespace":"elementor\/v1\/feedback","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/feedback\/submit"}]}},"\/elementor\/v1\/angie\/consent":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/angie\/consent"}]}},"\/elementor\/v1\/template-library\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"title":{"type":"string","description":"The title of the document","required":false},"type":{"description":"The document type.","type":"string","enum":["page","section","container"],"required":true},"content":{"description":"Elementor data object","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/template-library\/templates"}]}},"\/elementor\/v1\/system-info":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/system-info"}]}},"\/elementor\/v1\/user-data\/current-user":{"namespace":"elementor\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":{"suppressedMessages":{"type":"array","description":"Array of suppressed message keys","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/user-data\/current-user"}]}},"\/monsterinsights\/v1\/popular-posts\/themes\/(?P<type>[a-zA-Z0-9-]+)":{"namespace":"monsterinsights\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"required":false}}}]},"\/monsterinsights\/v1\/terms\/(?P<slug>[a-zA-Z0-9-_]+)":{"namespace":"monsterinsights\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"required":false}}}]},"\/monsterinsights\/v1\/taxonomy\/(?P<slug>[a-zA-Z0-9-_]+)":{"namespace":"monsterinsights\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"required":false}}}]},"\/omapp\/v1":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"omapp\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1"}]}},"\/omapp\/v1\/info":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/info"}]}},"\/omapp\/v1\/support":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/support"}]}},"\/omapp\/v1\/support\/debug\/enable":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/support\/debug\/enable"}]}},"\/omapp\/v1\/support\/debug\/disable":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/support\/debug\/disable"}]}},"\/omapp\/v1\/me":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/me"}]}},"\/omapp\/v1\/campaigns\/refresh":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/campaigns\/refresh"}]}},"\/omapp\/v1\/campaigns\/(?P<id>\\w+)":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}]},"\/omapp\/v1\/campaigns\/(?P<id>[\\w-]+)\/sync":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/omapp\/v1\/resources":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/resources"}]}},"\/omapp\/v1\/notifications":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/notifications"}]}},"\/omapp\/v1\/notifications\/dismiss":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/notifications\/dismiss"}]}},"\/omapp\/v1\/notifications\/create":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/notifications\/create"}]}},"\/omapp\/v1\/plugins":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/plugins"}]}},"\/omapp\/v1\/api":{"namespace":"omapp\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/api"}]}},"\/omapp\/v1\/settings":{"namespace":"omapp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/settings"}]}},"\/omapp\/v1\/review\/dismiss":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/review\/dismiss"}]}},"\/omapp\/v1\/omu\/courses":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/omu\/courses"}]}},"\/omapp\/v1\/omu\/guides":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/omu\/guides"}]}},"\/omapp\/v1\/account\/sync":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/account\/sync"}]}},"\/omapp\/v1\/account\/connect":{"namespace":"omapp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/account\/connect"}]}},"\/omapp\/v1\/wpforms\/forms":{"namespace":"omapp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/omapp\/v1\/wpforms\/forms"}]}},"\/wpforms\/v1":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpforms\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1"}]}},"\/wpforms\/v1\/setup-wizard\/hydrate":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/hydrate"}]}},"\/wpforms\/v1\/setup-wizard\/update":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/update"}]}},"\/wpforms\/v1\/setup-wizard\/install-plugins":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"plugins":{"type":"array","default":[],"items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/install-plugins"}]}},"\/wpforms\/v1\/setup-wizard\/complete":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"outcome":{"type":"string","default":"build","enum":["build","import","exit","forms"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/complete"}]}},"\/wpforms\/v1\/setup-wizard\/stripe\/connect-url":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/stripe\/connect-url"}]}},"\/wpforms\/v1\/setup-wizard\/license\/key":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/license\/key"}]}},"\/wpforms\/v1\/setup-wizard\/license\/verify":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wpforms\/v1\/setup-wizard\/license\/verify"}]}},"\/xpro\/v1\/dynamic-content":{"namespace":"xpro\/v1\/dynamic-content","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"xpro\/v1\/dynamic-content","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/xpro\/v1\/dynamic-content"}]}},"\/xpro\/v1\/dynamic-content\/(?P<action>\\w+)\/(?P<type>\\w+)\/(?P<key>\\w+(|[-]\\w+))":{"namespace":"xpro\/v1\/dynamic-content","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}]},"\/nps-survey\/v1":{"namespace":"nps-survey\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"nps-survey\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/nps-survey\/v1"}]}},"\/nps-survey\/v1\/rating":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"nps_id":{"type":"string","required":true},"rating":{"type":"integer","required":true},"comment":{"type":"string","default":"","required":false},"plugin_slug":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/nps-survey\/v1\/rating"}]}},"\/nps-survey\/v1\/dismiss-nps-survey":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"nps_id":{"type":"string","required":true},"plugin_slug":{"type":"string","required":true},"dismiss_timespan":{"type":"integer","required":true},"current_step":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/nps-survey\/v1\/dismiss-nps-survey"}]}},"\/elementor\/v1\/library\/connect":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","description":"Connect CLI token","required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/library\/connect"}]}},"\/elementor\/v1\/send-event":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"event_data":{"description":"All the recorded event data in JSON format","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/elementor\/v1\/send-event"}]}},"\/elementor\/v1\/events\/api\/(?P<path>.+)":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":[]}]},"\/elementor\/v1\/events\/libs\/(?P<file>[\\w\\-.]+)":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/mcp":{"namespace":"mcp","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mcp","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/mcp"}]}},"\/mcp\/novamira":{"namespace":"mcp","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/mcp\/novamira"}]}},"\/mcp\/mcp-adapter-default-server":{"namespace":"mcp","methods":["POST","GET","DELETE","POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]},{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/mcp\/mcp-adapter-default-server"}]}},"\/mcp\/novamira-oauth":{"namespace":"mcp","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/mcp\/novamira-oauth"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false},"_hostinger_reach_plugin_has_subscription_block":{"type":"boolean","required":false},"_hostinger_reach_plugin_is_elementor":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false},"_hostinger_reach_plugin_has_subscription_block":{"type":"boolean","required":false},"_hostinger_reach_plugin_is_elementor":{"type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false},"_hostinger_reach_plugin_has_subscription_block":{"type":"boolean","required":false},"_hostinger_reach_plugin_is_elementor":{"type":"boolean","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"generate_sub_sizes":{"type":"boolean","default":true,"description":"Whether to generate image sub sizes.","required":false},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"url":{"type":"string","format":"uri","description":"URL of an external image to sideload into the media library, instead of uploading a file.","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/sideload":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"image_size":{"description":"Image size. Can be a single size name or an array of size names to register the same file under multiple sizes.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/finalize":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"sub_sizes":{"description":"Array of sub-size metadata collected from sideload responses.","type":"array","default":[],"maxItems":100,"items":{"type":"object","properties":{"image_size":{"description":"Size name, or an array of size names when a single file is registered under multiple sizes with matching dimensions.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"width":{"type":"integer","minimum":1},"height":{"type":"integer","minimum":1},"file":{"type":"string","minLength":1},"mime_type":{"type":"string","pattern":"^image\/.*"},"filesize":{"type":"integer","minimum":1},"original_image":{"type":"string","minLength":1}}},"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/e-floating-buttons"}]}},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/elementor_library":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/elementor_library"}]}},"\/wp\/v2\/elementor_library\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/xpro-content":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","email_sent","email_failed","email_scheduled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/xpro-content"}]}},"\/wp\/v2\/xpro-content\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"om_disable_all_campaigns":{"type":"boolean","title":"","description":"","default":false},"_monsterinsights_skip_tracking":{"type":"boolean","title":"","description":"","default":false},"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","xpro_content","xpro-themer","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"aioseo_meta_data":{"type":"object","required":false},"_aioseop_title":{"type":"string","required":false},"_aioseop_description":{"type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/xpro-content\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/xpro-content\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","e-floating-buttons":"e-floating-buttons","elementor_library":"elementor_library","xpro_content":"xpro_content"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","e-floating-buttons","elementor_library","xpro_content","category","post_tag","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"elementor_one_welcome_screen_completed":{"title":"","description":"Elementor One Welcome Screen Completed","type":"boolean","required":false},"elementor_one_dismiss_connect_alert":{"title":"","description":"Elementor One Dismiss Connect Alert","type":"boolean","required":false},"elementor_one_dismiss_elementor_one_subscription_alert":{"title":"","description":"Elementor One Dismiss Elementor One Subscription Alert","type":"boolean","required":false},"ea11y_widget_menu_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_widget_icon_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_skip_to_content_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_widget_activation_settings":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_plan_data":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_accessibility_statement_data":{"title":"","description":"","type":"object","additionalProperties":true,"required":false},"ea11y_close_post_connect_modal":{"title":"","description":"","type":"boolean","required":false},"ea11y_hide_minimum_active_options_alert":{"title":"","description":"","type":"boolean","required":false},"ea11y_analytics_enabled":{"title":"","description":"","type":"boolean","required":false},"ea11y_show_accessibility_generated_page_infotip":{"title":"","description":"","type":"boolean","required":false},"ea11y_unfiltered_files_upload":{"title":"","description":"","type":"boolean","required":false},"ea11y_close_onboarding_modal":{"title":"","description":"","type":"boolean","required":false},"ea11y_close_get_started_modal":{"title":"","description":"","type":"boolean","required":false},"ea11y_migration_popup_dismissed":{"title":"","description":"","type":"boolean","required":false},"ea11y_dismissed_quota_notices":{"title":"","description":"","type":"array","items":{"type":"string"},"required":false},"ea11y_review_data":{"title":"","description":"","type":"object","additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false},"namespace":{"description":"Limit results to abilities in a specific namespace.","type":"string","required":false},"meta":{"description":"Limit results to abilities matching all of the given meta fields.","type":"object","properties":{"annotations":{"description":"Limit results to abilities matching the given behavioral annotations.","type":"object","properties":{"readonly":{"description":"Whether the ability does not modify its environment.","type":["boolean","null"]},"destructive":{"description":"Whether the ability may perform destructive updates to its environment.","type":["boolean","null"]},"idempotent":{"description":"Whether repeated calls with the same arguments have no additional effect.","type":["boolean","null"]}},"additionalProperties":true}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]},"\/wp\/v2\/icons":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/icons"}]}},"\/wp\/v2\/icons\/(?P<collection>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}]},"\/wp\/v2\/icons\/(?P<name>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?\/[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Icon name.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/icon-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/icon-collections"}]}},"\/wp\/v2\/icon-collections\/(?P<slug>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Icon collection slug.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/view-config":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"description":"Entity kind.","type":"string","required":true},"name":{"description":"Entity name.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/view-config"}]}}},"site_logo":0,"site_icon":108,"site_icon_url":"https:\/\/sadeedpro.com\/wp-content\/uploads\/sadeed\/sadeed-favicon-512.png","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_icon","href":"https:\/\/sadeedpro.com\/ar\/wp-json\/wp\/v2\/media\/108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}