Request a quote.
Tell us about the space, the programme and the constraints. Every enquiry is acknowledged within one business day by a member of our team — not an automated reply.
Project enquiry
This form is for project enquiries only. We do not accept marketing, SEO, web development, or recruitment-agency offers.
- +971 55 511 4047
- Admin@sadeedpro.com
- Dubai Design District (d3), Dubai
- Monday – Saturday, 08:30 – 18:00 (GST)
Based in Dubai, we take on projects across the UAE. Site work is coordinated by our own team together with our approved specialist partners.
Questions we are asked before every project.
What services does SADEED provide?
Three integrated programmes. SADEED Design covers interior design, space planning, fit-out and joinery, with MEP coordination and authority approvals. SADEED Revive covers renovation, refurbishment and reconfiguration of existing spaces. SADEED Care covers facility management and preventive maintenance — electrical and plumbing within our licensed scope, and HVAC and fire & life-safety through approved specialist partners under our coordination.
Which areas of the UAE do you cover?
We are based in Dubai and work with clients across the UAE. Coverage for a specific location is confirmed at enquiry stage based on scope and access.
How long does a quotation take?
Every enquiry is acknowledged within one business day. A budget indication usually follows within two to three working days of a site visit. A fully detailed quotation depends on the scope, and typically takes five to seven working days.
How is a project managed day to day?
A single project manager owns the work from mobilisation to handover and is your one point of contact. You receive a programmed schedule at the outset and structured progress reporting throughout, with issues raised early rather than at completion.
Do you handle authority approvals?
Yes. Authority and building management submissions are part of our scope — drawings, NOCs and inspection coordination are managed by our team. Approval periods are built into the programme we quote rather than treated as an unplanned delay.
Is MEP work carried out in-house?
Electrical and plumbing works fall within our licensed scope and are handled by our team. HVAC and fire & life-safety are delivered through approved specialist contractors under our single-point coordination, so you still deal with one accountable partner.
What does an annual maintenance contract include?
A typical AMC covers scheduled preventive maintenance of HVAC, electrical and plumbing systems, defined response times for corrective callouts, and periodic condition reporting. Scope and visit frequency are set against the specific asset — a single retail unit and a mixed-use tower do not warrant the same schedule.
Can renovation be done while we stay operational?
Yes, and it is a large share of our renovation work. Works are phased, noisy trades are sequenced outside operating hours where required, and safe segregation is maintained between the works area and the running business. We plan this at quotation stage, not after mobilisation.